Hydrus have been contracted the routine maintenance and repair of a coiled tube lifting frame for a global vessel operator.

Hydrus set up the coiled tube lifting frame at its refurbishment and assembly bay, supported by an 80 ton gantry crane.

The scope of work included a full geometry and laser assessment, piston strip and rebuild - function test, bumper bars fabrication and assembly. Hydrus also provided the transport of a containerised flushing unit to the vessel for further on-board maintenance.

Hydrus provided 24 hour mechanical / hydraulic fitter cover throughout the project.